Data Center Construction
CA holds 21.9% of the indexed Data Center Construction suppliers across 18 states. The supply base is unconcentrated (HHI 977).
How to read this
HHI is the sum of squared shares, from near zero when supply is spread evenly to 10,000 when one state holds all of it. Above 2,500 is treated as highly concentrated, between 1,500 and 2,500 as moderately so.
Effective states is the number of equal-sized states that would produce the same HHI. It is the plainer version of the same fact: 10.2 states' worth of capability supply, spread across 18.
Measured Sep 21, 2026 over the manufacturers BOMForge has indexed. Our coverage is not the whole country, so a share here is a share of what is indexed.
Lost a supplier? Tell us what you need.
Send the part, the process or the certification and where it has to be made. We come back with plants that can do the work and what our evidence is for each one.
Open a dispatchOr search the index yourself on BOMForge.